Surveying
JT Engineering provided the survey work needed for preliminary design for WIS 187 from WIS 54 to the County Line. Survey work included: points of intersections and curvature for alignment on WIS 187, collection of side road alignments, comparison of centerlines with CSM’s provided by WisDOT, culvert pipe survey for all crossdrains, determination of superelevation rates on curves, verification of encroachments into the right-of-way, and Digital Terrain Modeling for specified areas for each cross drain.